Objectives:
1) 1) To review on the feedback give from the assessor.
Methodology:
1) List all the feedback that come out during the presentation day
2) Comment for every feedback that related to the project.
Result:
1) How much maximum power can be generate?
The power for this project is actually not very big due to the size of solar panel and size of generator use. In addition, this project only run in DC and depends on the battery life to run any load.
2) How long the time taken to finish the project?
To finish this project, it takes more than 2 month start from buying the component and designing this project.
3) The time taken to fully charge the battery?
For my prototype, the battery that i use is 12V 7.2ah. It not give the problem to solar panel to charge the battery because the radiation of sun was enough and it exceed 18V when on peak hour. So, when the charging voltage is over the battery, no problem for solar panel to charge the battery but it become problem to the wind turbine side because it only produce very small reading of voltage.
Analysis and Discussion:
Based on the question from the assessor from presentation day, i think my project will be improve for the next time and when it want to be install at the housing area.
conclusion:
As a conclusion, the comment from assessor was helping me a lot to improve my project for the future.