WEEK 17 (FYP 1)

Image
  WEEK 17 (SUBMITTING THE PROPOSAL REPORT)   Objectives: 1)  To submit the proposal report chapter 1,2,3 and 4.   Methodology: 1)  Consult with Madam Johara on how the procedure to submit the proposal report.   Result: As the result, Madam Johara tell to my group to submit the proposal report by email and no need to print out due to MCO session. Thus, I just submit the softcopy of the proposal report through email by attached the document with full name and ID number. For the plagiarism checked by using turnitin, my report was exceed to 17% similarity. Thus, my report was good enough in contents and not more 20% similarity. So I do not need to repair any more for another submission otherwise I want to double check again if necessary. Below is the result of the plagiarism check: Analysis and Discussion After having the report check by supervisor, Madam Johara the percentage of plagiarism of my report         which lowe...

WEEK 16 (FYP 1)

  WEEK 16 (CONCLUSION FOR THE OVERALL PROJECT)   Objectives: 1)  T o write a conclusion for the whole of the project. 2)    T o achieve the objectives of the project.   Methodology: 1)  Summarise up the overall of the project. 2)    M ake sure the knowledge of the development of the project is accomplished. 3)   State whether the objectives of the project were accomplished.   Result: As a conclusion, all the objectives that already mentioned were accomplished. The project were  develop ed  the prototype of solar energy and wind energy hybrid  system  and t o monitor the values of voltage, current and capacity of battery by using IoT system .   A  hybrid power generation system was   built   in this project, which demonstrates the  different characteristics of the system. From the model  characteristics  analysis, this hybrid power system can come out with  voltage stab...

WEEK 15 (FYP 1)

Image
    WEEK 15 (OBTAINING THE EXPECTED RESULT)   Objectives: 1)  T o obtain the expected results for the project.   Methodology: 1)  Do a research based on the previous project. 2)  U nderstand the purpose and flow of the project. 3)  Predict the output. 4) Produce an expected results based on research and process of the project.   Result: Conclusion: As the conclusion, the objective which was to obtain an expected result for the project was accomplished. The results were obtained by understanding the aim of the project from previous existing project and processed.

WEEK 14 (FYP 1)

  WEEK 14 (PROPOSAL PROJECT WRITING)   Objectives: 1)  To write the proposal of the project for FYP 1 project. 2)   To key in all the previous work that have done through out the progress report.   Methodology: 1)  Starting from chapter 1 until chapter 4 with correct format as hardcover report. 2)   All the data mostly taking back from previous data from this progress report. 3)  Submit to the Madam Johara before week 17.   Result: As a result, all the data was gathered and need to  be check the plagiarism by M adam Johara . For us, we need to submit two type of document in different format which is proposal and FYP report with correct format. So, i just combine the two document and make it one and submit to M adam Johara   t hrough  an   email .    Analysis and Discussion:   By writing this proposal and report, i could manage to increase more in my knowledge and it help me to understand more about...

WEEK 13 (FYP 1)

  WEEK 13 (EXPECTED BUGDET OF THE COMPONENT)   Objectives: 1)  T o produce cost outline for the project. 2)  To design on what device need to be finish the project.   Methodology: 1)  M ake a listing of the component and hardware that needed to put in the project. 2)  Survey the price for every component and hardware.   Result: The table below shows the estimation of the costing component for the project   Item P rice per Unit(RM) Quantity Total (RM) Node MCU 19.00 1 19.00 Digital Meter 17.00 2 34.00 Charge controller 27.00 2 54.00 4-  Channel Relay Controller 23.00 1 23.00 12V DC motor generator 25.00 1 25.00 DC-DC converter 12V 19.00 1 19.00 Windmill Generator 12V 60.00 1 60.00 Battery 12V 65.00 1 65.00 Power Supply 40.00 1 40.00   TOTAL   RM 339.00         Analysis  and  Discussion: This is just a draft for costing for now and it will be update soon when the project was done on the next semester...

WEEK 12 (FYP 1)

Image
  WEEK 12 (PRODUCE FLOWCHART)   Objectives: 1)  To develop a flowchart for the FYP project .   Methodology: 1)  Understand all the flow process of the project . 2)  Produce the correct flowchart for the project .   Result: The figure below shows the flowchart of the project. Analysis / discussion:  To get the correct flowchart, i need to recorrect it for a few time by consult to M adam Johara . From the flowchart, the flow only focus on how to get all the data for voltage, current from the two source. It also focus on the data transfer and generate into the microcontroller to  display  in the blynk apps. Conclusion: For the conclusion, the objective was achieve which is to produce the flowchart for this project.

WEEK 11 (FYP 1)

Image
  WEEK 11 (EXPLAIN JUSTIFICATION OF CONTROLLER, INPUT AND OUTPUT)   Objectives: 1)  To study the uses of microcontroller that has been selected. 2)   To analyze the information about the controller.   Methodology: 1)  Select the suitable of microcontroller. 2)   Study about their input and output 3)   State the function of their input and output   Result: The Node MCU Development board was selected as my microcontroller. Node MCU Programmable IOT Development Board Input Voltage 5V Operating Voltage 3.3V Wi-Fi type 11 b/n Wi-Fi Direct (P2P), soft-AP Protocol Integrated TCP/IP protocol stack Programming Chip CP2102 Serial/USB Chip Output Power +19.5dBm in 802.11b mode Memory 4MB Flash Memory CPU Integrated low power 32-bit CPU Interface SDIO 1.1/2.0, SPI, UART Dimensions 49mm  x   24.5mm  x   13mm Weight Approx. 12g       Conclusion: As a conclusion, the microcontroller that be use is ...