WEEK 13 (FYP 1)

 WEEK 13 (EXPECTED BUGDET OF THE COMPONENT)

 

Objectives:

1) To produce cost outline for the project.

2) To design on what device need to be finish the project.

 

Methodology:

1) Make a listing of the component and hardware that needed to put in the project.

2) Survey the price for every component and hardware.

 

Result:

The table below shows the estimation of the costing component for the project

 

Item

Price per Unit(RM)

Quantity

Total (RM)

Node MCU

19.00

1

19.00

Digital Meter

17.00

2

34.00

Charge controller

27.00

2

54.00

4- Channel Relay Controller

23.00

1

23.00

12V DC motor generator

25.00

1

25.00

DC-DC converter 12V

19.00

1

19.00

Windmill Generator 12V

60.00

1

60.00

Battery 12V

65.00

1

65.00

Power Supply

40.00

1

40.00

 

TOTAL

 

RM 339.00

 

 

 

 

Analysis and Discussion:

This is just a draft for costing for now and it will be update soon when the project was done on the next semester which is my FYP 2.

 

Conclusion:

As for conclusion, i was done to estimate the costing on this project for this semester.