WEEK 13 (FYP 1)
WEEK 13 (EXPECTED BUGDET OF THE COMPONENT)
Objectives:
1) To produce cost outline for the project.
2) To design on what device need to be finish the project.
Methodology:
1) Make a listing of the component and hardware that needed to put in the project.
2) Survey the price for every component and hardware.
Result:
The table below shows the estimation of the costing component for the project
Item | Price per Unit(RM) | Quantity | Total (RM) |
Node MCU | 19.00 | 1 | 19.00 |
Digital Meter | 17.00 | 2 | 34.00 |
Charge controller | 27.00 | 2 | 54.00 |
4- Channel Relay Controller | 23.00 | 1 | 23.00 |
12V DC motor generator | 25.00 | 1 | 25.00 |
DC-DC converter 12V | 19.00 | 1 | 19.00 |
Windmill Generator 12V | 60.00 | 1 | 60.00 |
Battery 12V | 65.00 | 1 | 65.00 |
Power Supply | 40.00 | 1 | 40.00 |
| TOTAL |
| RM 339.00 |
Analysis and Discussion:
This is just a draft for costing for now and it will be update soon when the project was done on the next semester which is my FYP 2.
Conclusion:
As for conclusion, i was done to estimate the costing on this project for this semester.